{"id":"A.AM.IANYMVPYCS5QL","name":"Armenia, Commissioning of fixed assets from commissioning of fixed assets by electricity, gas, steam and air conditioning supply by electric power generation,  transmission and distribution    (in % of total)","country":{"code":"AM","name":"Armenia"},"frequency":"annual","geometry":"point","firstDate":"2016-01-01T00:00:00Z","lastDate":"2024-01-01T00:00:00Z","lastPeriod":"2024","lastValue":11.2,"lastCollectedAt":"2026-10-30T15:50:04.490573Z","categories":[{"id":"construction","name":"Construction"}]}